1. Routine Maintenance

  1. Inspection of Cable Arrangement: Ensure cables are orderly arranged, free from mechanical damage, and that signage is complete, accurate, and clear.
  2. Ceramic Sleeve Examination: Regularly inspect the ceramic sleeve of cable terminals for any damage, cracks, dirt, and discharge.
  3. Connection Reliability: Verify the reliability of cable terminal connections and check for any signs of overheating or looseness.
  4. Terminal Condition Monitoring: Regularly monitor cable terminals for any oil leaks, adhesive leaks, breakages, or burn marks.

2. Annual Maintenance

  1. Preventive Testing: Conduct preventive tests as per the stipulated requirements to ensure the longevity and functionality of the cables.
  2. Cable Trench Inspection: Regularly remove dust and inspect cable trenches and wells for debris, water accumulation, and structural integrity.
  3. Defect Resolution: Address and rectify any defects identified during the routine and annual maintenance checks to maintain optimal cable performance.

3. Inspection after the operation

Check itemCheck locationInspection standardsDetection method
Cable phase sequencecable terminatorComply with the wiring sequence before the operationVisual, Manual
LegacyOn-siteAll tools and utensils are collected and counted, and the work surface is clean and hygienicVisual, Manual
Connection partCable connectorThe connection is tight, the appearance is good, and the wiring is correct.Visual, Manual
4. Addressing Common Faults
Overheating Due to Loose Cable Ends:
Procedure: Isolate the relevant equipment and implement organizational and technical measures to ensure safety. Discharge the cables before operation.
Solution: Depending on the location of overheating, re-tighten connections, re-wrap the insulation, or remake the cable head.
Flashover Due to Pollution on Cable Termination Porcelain Sleeve:
Procedure: Isolate the faulty equipment and implement safety measures. Clean and descale the affected porcelain sleeve and observe after testing power transmission.
Solution: If cleaning doesn’t resolve cracks on the meter body, replace it with qualified spare parts.
Low Cable Insulation Resistance:
Procedure: Measure the insulation as per regulations and compare with historical data. If the difference is minor, resume operation but intensify inspections.
Solution: If there’s a significant difference compared to historical data, conduct a DC withstand voltage test to confirm the insulation condition.
←WeChat Scan
←WeChat Scan
Email*
WhatsApp/Tel*
Inquiry
正在提交!
Submitted successfully!
Submitting!
Email is wrong!
Phone is wrong!
The prev: The next:

Related recommendations

  • Solar Power System

    1217

    YORO Solar: Unparalleled expertise in solar power systems and components. Offering high-quality photovoltaic wiring solutions with a 30-year warranty.

    View details
  • Protection Components

    1201

    YORO Solar: Leading Provider of Quality Solar Protection Components. Ensuring Trusted and Reliable Solutions for All PV Installations

    View details
  • Application FAQ

    1208

    Explore the vital aspects of solar junction boxes, including their electrical performance, working voltage, junction temperature current, and connection methods.

    View details
  • How To Install And Use Solar Cables?

    1306

    Discover a comprehensive guide on how to install solar cables using connectors for optimal connectivity and safety. Learn about the essential tools, installation steps, and tips for securing connections, along with testing procedures to ensure sta...

    View details
Click Cancel to reply
    Expand more!