Inspection of Cable Arrangement: Ensure cables are orderly arranged, free from mechanical damage, and that signage is complete, accurate, and clear.
Ceramic Sleeve Examination: Regularly inspect the ceramic sleeve of cable terminals for any damage, cracks, dirt, and discharge.
Connection Reliability: Verify the reliability of cable terminal connections and check for any signs of overheating or looseness.
Terminal Condition Monitoring: Regularly monitor cable terminals for any oil leaks, adhesive leaks, breakages, or burn marks.
2. Annual Maintenance
Preventive Testing: Conduct preventive tests as per the stipulated requirements to ensure the longevity and functionality of the cables.
Cable Trench Inspection: Regularly remove dust and inspect cable trenches and wells for debris, water accumulation, and structural integrity.
Defect Resolution: Address and rectify any defects identified during the routine and annual maintenance checks to maintain optimal cable performance.
3. Inspection after the operation
Check item
Check location
Inspection standards
Detection method
Cable phase sequence
cable terminator
Comply with the wiring sequence before the operation
Visual, Manual
Legacy
On-site
All tools and utensils are collected and counted, and the work surface is clean and hygienic
Visual, Manual
Connection part
Cable connector
The connection is tight, the appearance is good, and the wiring is correct.
Visual, Manual
4. Addressing Common Faults Overheating Due to Loose Cable Ends: Procedure: Isolate the relevant equipment and implement organizational and technical measures to ensure safety. Discharge the cables before operation. Solution: Depending on the location of overheating, re-tighten connections, re-wrap the insulation, or remake the cable head. Flashover Due to Pollution on Cable Termination Porcelain Sleeve: Procedure: Isolate the faulty equipment and implement safety measures. Clean and descale the affected porcelain sleeve and observe after testing power transmission. Solution: If cleaning doesn’t resolve cracks on the meter body, replace it with qualified spare parts. Low Cable Insulation Resistance: Procedure: Measure the insulation as per regulations and compare with historical data. If the difference is minor, resume operation but intensify inspections. Solution: If there’s a significant difference compared to historical data, conduct a DC withstand voltage test to confirm the insulation condition.
Discover a comprehensive guide on how to install solar cables using connectors for optimal connectivity and safety. Learn about the essential tools, installation steps, and tips for securing connections, along with testing procedures to ensure sta...
Solar Junction Box: The Heart of Solar PanelsKey Features and BenefitsPV Junction Box: Ensuring Safe and Efficient Power TransferAdvanced Technology for Maximum EfficiencySolar Array Junction Box: Integrating Multiple PanelsEnhancing System Reliab...
Explore essential considerations in the construction of photovoltaic cables to ensure optimal operation and prevent failures. Learn about addressing eddy currents, avoiding mechanical damage, ensuring proper grounding, and prioritizing safety duri...